OR 86 (HWY 12) over POWDER RIVER

09.0 W OF RICHLAND OREGON · County 001, Oregon · Built 1987 · 2 Lanes · 589 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
16810 012 03071
Year Built
1987
Length
117.7 m (386.2 ft)
Max Span
41.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
589
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,356,000
Total Project Cost
$2,170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.