SUCCOR C-816TIFFEN over SUCCOR CR
065 W US HWY 95 · County 045, Oregon · Built 1988 · 2 Lanes · 55 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.3304, -117.084
This bridge is in worse condition than 34.3% of bridges in County 045. The average bridge in Oregon is 0 years old; this one is 38 years old.
Bridge Details
- Structure #
- 15760A081600155
- Year Built
- 1988
- Length
- 21.6 m (70.9 ft)
- Max Span
- 20.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 55
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.