US 95 (HWY 456) over SUCCOR CREEK
2.2 MI. SW IDAHO ST. LINE · County 045, Oregon · Built 1975 · 2 Lanes · 2,049 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.245103, -117.035397
This bridge is in worse condition than 34.3% of bridges in County 045. The average bridge in Oregon is 0 years old; this one is 51 years old.
Bridge Details
- Structure #
- 02118A456 00216
- Year Built
- 1975
- Length
- 45 m (147.6 ft)
- Max Span
- 14.9 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,049
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $480,000
- Total Project Cost
- $769,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.