POODLE CREEK ROAD over LONG TOM

050 MI N. CITY OF NOTI · County 039, Oregon · Built 1978 · 2 Lanes · 1,248 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
13988A434800663
Year Built
1978
Length
24.1 m (79.1 ft)
Max Span
23.8 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,248
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.