OR 36 (HWY 229) over LONG TOM RIVER 3RD XING

05.3 W CHESHIRE PO · County 039, Oregon · Built 1949 · 2 Lanes · 2,122 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00728A229 03839
Year Built
1949
Length
19.3 m (63.3 ft)
Max Span
9.7 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
2,122
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.