FAYETTEVILLE DR. over MUDDY CREEK

019 MI E CR 2 · County 043, Oregon · Built 1977 · 2 Lanes · 299 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
13188 001300188
Year Built
1977
Reconstructed
2012
Length
96.9 m (317.9 ft)
Max Span
11 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
299
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,015,000
Total Project Cost
$1,624,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.