ABRAHAM DR over CREEK

015 MI E PEORIA · County 043, Oregon · Built 1964 · 2 Lanes · 72 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
12338 020600148
Year Built
1964
Length
12.5 m (41 ft)
Max Span
6.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
72
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$170,000
Total Project Cost
$272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.