SW MORRISON over HWY 61
0.1 MI N OF TAYLOR ST · County 051, Oregon · Built 1968 · 1 Lanes · 40,751 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
45.52095, -122.68565
This bridge is in worse condition than 12.5% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 58 years old.
Nearby Bridges
SW YAMHILL ST over HWY 61
Built 1968
SW ALDER over HWY 61
Built 1968
SW 14 TH CO over HWY 61
Built 1968
TAYLOR ST over HWY 61
Built 1968
CONN 4 over HWY 61
Built 1968
BURNSIDE ST over HWY 61
Built 1968
SALMON ST over HWY 61
Built 1968
NW COUCH BURNSIDE over SB ON RAMP CONN 5
Built 1968
NW COUCH ST over HWY 61 NB CONN 2
Built 1968
NW COUCH ST CO over HWY 61
Built 1968
Bridge Details
- Structure #
- 09283 061 00207
- Year Built
- 1968
- Length
- 47 m (154.2 ft)
- Max Span
- 23.7 m
- Width
- 18.3 m (60 ft)
- Lanes
- 1
- Daily Traffic
- 40,751
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $963,000
- Total Project Cost
- $1,541,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.