CONN 4 over HWY 61

0.1 MI S OF MORRISON ST · County 051, Oregon · Built 1968 · 1 Lanes · 2,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

45.519461, -122.686611

This bridge is in worse condition than 74.6% of bridges in County 051. The average bridge in Oregon is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
09249 061C00113
Year Built
1968
Length
58.2 m (190.9 ft)
Max Span
33.9 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
2,600
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.