CITY STREET 19T6 over 10TH ST. @ BEAR CR.

TENTH ST AT BEAR CREEK · County 029, Oregon · Built 1960 · 3 Lanes · 9,097 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
08752 006 00120
Year Built
1960
Length
65.6 m (215.2 ft)
Max Span
21.9 m
Width
19.1 m (62.7 ft)
Lanes
3
Daily Traffic
9,097
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$759,000
Total Project Cost
$1,214,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.