CITY STREET 19T3 over 8TH STREET @ BEAR CREEK

EIGHTH ST AT BEAR CREEK · County 029, Oregon · Built 1959 · 2 Lanes · 10,030 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
08607 003 00005
Year Built
1959
Length
55.5 m (182.1 ft)
Max Span
21.3 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
10,030
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$641,000
Total Project Cost
$1,025,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.