I-5 (HWY 001) over I-5 @ PORTLAND AVE
03.1 M N JCT HWY 035 · County 019, Oregon · Built 1954 · 4 Lanes · 42,268 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.198786, -123.359681
This bridge is in worse condition than 39.4% of bridges in County 019. The average bridge in Oregon is 0 years old; this one is 72 years old.
Nearby Bridges
OR 138 (HWY 138)EB over SOUTH UMPQUA RIVER
Built 1971
OR 138 (HWY 138)WB over SOUTH UMPQUA RIVER
Built 1961
I-5 (HWY 001) over I-5 @ HARVARD AVE
Built 1976
I-5 (HWY 001) over I-5 @ BELLOWS ST
Built 1976
I-5 (HWY 001) CON over I-5 @ BELLOWS ST
Built 1976
I-5 (HWY 001) over I-5 @ MCLAIN RD
Built 2009
JACKSON STREET over DEER CREEK
Built 1927
OR 138 (HWY 138) over DEER CREEK
Built 1967
STEWART PARK ROAD over SOUTH UMPQUA RIVER
Built 1946
FOWLER ST over DEER CREEK
Built 1980
Bridge Details
- Structure #
- 07670A001 12301
- Year Built
- 1954
- Reconstructed
- 1977
- Length
- 39.6 m (129.9 ft)
- Max Span
- 12.2 m
- Width
- 27.9 m (91.5 ft)
- Lanes
- 4
- Daily Traffic
- 42,268
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $423,000
- Total Project Cost
- $676,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.