US 30 (HWY 92) over Big Creek
120 MI E ASTORIA · County 007, Oregon · Built 1951 · 2 Lanes · 8,456 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.141853, -123.402925
This bridge is in worse condition than 33.5% of bridges in County 007. The average bridge in Oregon is 0 years old; this one is 75 years old.
Nearby Bridges
HWY 2W CONN over US 30 (HWY 92)
Built 1967
WESTPORT FERRY APP over WESTPORT SLOUGH
Built 2016
WESTPORT FERRY RD over PLYMPTON CREEK
Built 1992
US 30 (HWY 92) over Plympton Creek
Built 1958
FERRY RAMP over COLUMBIA R/SR 409
Built 2010
Hungry Hollow Loop over WEST CREEK
Built 2003
Hungry Hollow Loop over WEST CREEK
Built 2003
SR 409 over GARDEN SLOUGH
Built 1982
OR 22 (Hwy 30) over Salt Creek
Built 1934
SR 409 over COLUMBIA R PUGET ISLAND
Built 1938
Bridge Details
- Structure #
- 07417 02W 08252
- Year Built
- 1951
- Length
- 47.5 m (155.8 ft)
- Max Span
- 18.9 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 8,456
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $500,000
- Total Project Cost
- $799,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.