ROAD over SALMON RIVER

S-27 T-3S R-7E WM · County 005, Oregon · Built 1958 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
060609000001466
Year Built
1958
Length
53.3 m (174.9 ft)
Max Span
27.4 m
Width
5.7 m (18.7 ft)
Lanes
1
Daily Traffic
50
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.