WILES ROAD over SOAP CREEK
0014 MI N OF 04451 · County 003, Oregon · Built 1960 · 2 Lanes · 102 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
44.699689, -123.246269
This bridge is in worse condition than 89.5% of bridges in County 003. The average bridge in Oregon is 0 years old; this one is 66 years old.
Nearby Bridges
TAMPICO ROAD over SOAP CREEK
Built 1956
ROBISON RD over SOAP CREEK
Built 1977
DE ARMOND ROAD over BERRY CREEK
Built 1978
OR 99W (Hwy 91) over Berry Creek
Built 1923
OR 99W (Hwy 91) over Soap Creek
Built 1923
TAMPICO ROAD over BERRY CREEK
Built 1959
NW RYALS AVE over BOWERS SLOUGH
Built 1965
CORVALLIS ROAD over SOAP CREEK
Built 1981
AIRLIE ROAD over PETERSON CREEK
Built 1986
Farm Entrance over Drainage Channel
Built 1956
Bridge Details
- Structure #
- 03C19 000
- Year Built
- 1960
- Length
- 20.7 m (67.9 ft)
- Max Span
- 8.2 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 102
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $218,000
- Total Project Cost
- $348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.