TAMPICO ROAD over BERRY CREEK
0028 MI S OF POLK CO · County 003, Oregon · Built 1959 · 2 Lanes · 102 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.716519, -123.299981
This bridge is in worse condition than 34.7% of bridges in County 003. The average bridge in Oregon is 0 years old; this one is 67 years old.
Nearby Bridges
AIRLIE ROAD over PETERSON CREEK
Built 1986
DE ARMOND ROAD over BERRY CREEK
Built 1978
ROBISON RD over SOAP CREEK
Built 1977
WILES ROAD over SOAP CREEK
Built 1960
TAMPICO ROAD over SOAP CREEK
Built 1956
OR 99W (Hwy 91) over Berry Creek
Built 1923
OR 99W (Hwy 91) over Soap Creek
Built 1923
AIRLIE ROAD over LUCKIAMUTE RIVER
Built 2006
MAXFIELD CR RD over MAXFIELD CREEK
Built 1968
MAXFIELD CR RD over MAXFIELD CREEK
Built 1968
Bridge Details
- Structure #
- 03C15 000
- Year Built
- 1959
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.9 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 102
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.