OR 99E (Hwy 81) over Partial Viaduct

IN OREGON CITY · County 005, Oregon · Built 1940 · 4 Lanes · 19,677 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
02732 01E 01222
Year Built
1940
Length
102.4 m (336 ft)
Max Span
10.1 m
Width
5 m (16.4 ft)
Lanes
4
Daily Traffic
19,677
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,076,000
Total Project Cost
$1,721,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.