OR 99E (Hwy 81) over Willamette River

IN OREGON CITY · County 005, Oregon · Built 1940 · 4 Lanes · 19,211 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
02374 01E 01229
Year Built
1940
Length
113.3 m (371.7 ft)
Max Span
21.3 m
Width
18.8 m (61.7 ft)
Lanes
4
Daily Traffic
19,211
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,191,000
Total Project Cost
$1,906,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.