US101(HWY009) over CHETCO RIVER

05.1 MI N OR - CALIF S L · County 015, Oregon · Built 1972 · 4 Lanes · 18,250 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
01143D009 35798
Year Built
1972
Length
339.5 m (1113.8 ft)
Max Span
73.2 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
18,250
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,567,000
Total Project Cost
$5,707,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.