U.S. HIGHWAY 101 over GILBERT CREEK

01-DN-101-45.30 · County 015, California · Built 1953 · 2 Lanes · 7,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01 0024
Year Built
1953
Reconstructed
2007
Length
49.4 m (162.1 ft)
Max Span
15.8 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
7,300
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.