HWY 225 over CORP

01.0 MI S HWY 015 JCT · County 039, Oregon · Built 1921 · 2 Lanes · 10,298 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
00373 225 00101
Year Built
1921
Reconstructed
1966
Length
96 m (315 ft)
Max Span
11.3 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
10,298
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.