GLENWOOD BLVD over UNION PACIFIC R/R

002 MI N GLENWOOD I5 INT · County 039, Oregon · Built 1978 · 2 Lanes · 9,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
016329181800043
Year Built
1978
Length
38.7 m (127 ft)
Max Span
37.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
9,000
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.