22 S 08 W 10.00: over PARADISE CREEK

1.5 miles E of Hwy 38 (MP · County 019, Oregon · Built 2013 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L2013231
Year Built
2013
Length
16 m (52.5 ft)
Max Span
15.2 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
50
Material
Prestressed Concrete
Design
Slab
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.