14 S 06 W 34.01: over Coleman Creek

0.9 Miles S of HWY 34 (MP · County 003, Oregon · Built 2012 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0000000L2010372
Year Built
2012
Length
19.2 m (63 ft)
Max Span
18.3 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Slab
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.