14 S 06 W 34.01: over SOUTH FORK ALSEA RIVER

0.9 miles S of Hwy 34 (MP · County 003, Oregon · Built 1966 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439344
Year Built
1966
Length
27.4 m (89.9 ft)
Max Span
17.1 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
150
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.