07 S 04 E 29.01: over SOUTH FORK MOLALLA RIVER
7.2 miles SE of Molalla o · County 005, Oregon · Built 1980 · 1 Lanes · 25 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.931389, -122.349169
This bridge is in worse condition than 10.1% of bridges in County 005. The average bridge in Oregon is 0 years old; this one is 46 years old.
Nearby Bridges
07 S 03 E 14.02: over COPPER CREEK
Built 1977
07 S 03 E 14.00: over TABLE ROCK FORK MOLALLA
Built 1974
07 S 03 E 14.02: over TABLE ROCK FORK MOLALLA
Built 1975
07 S 03 E 14.00: over TABLE ROCK FORK MOLALLA
Built 1974
07 S 03 E 16.00: over SOUTH FORK MOLALLA RIVER
Built 1966
07 S 04 E 02.00: over MIDDLE FORK MOLALLA RIVE
Built 1974
07 S 03 E 14.00: over HUNTER CREEK
Built 1974
07 S 04 E 01.01: over TRIB TO LOST CREEK
Built 1974
ROAD over LITTLE N SANTIAM R
Built 1991
ROAD over LITTLE N SANTIAM R
Built 1965
Bridge Details
- Structure #
- 0000000L1439385
- Year Built
- 1980
- Length
- 30.5 m (100.1 ft)
- Max Span
- 29.3 m
- Width
- 23.8 m (78.1 ft)
- Lanes
- 1
- Daily Traffic
- 25
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Land Management
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.