07 S 04 E 29.01: over SOUTH FORK MOLALLA RIVER

7.2 miles SE of Molalla o · County 005, Oregon · Built 1980 · 1 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439385
Year Built
1980
Length
30.5 m (100.1 ft)
Max Span
29.3 m
Width
23.8 m (78.1 ft)
Lanes
1
Daily Traffic
25
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.