07 S 03 E 14.02: over COPPER CREEK
7.2 miles SE of Molalla o · County 005, Oregon · Built 1977 · 1 Lanes · 10 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.888889, -122.366669
This bridge is in worse condition than 10.1% of bridges in County 005. The average bridge in Oregon is 0 years old; this one is 49 years old.
Nearby Bridges
07 S 04 E 29.01: over SOUTH FORK MOLALLA RIVER
Built 1980
NORTH FORK RD over EVANS CREEK
Built 1978
ROAD over LITTLE N SANTIAM R
Built 1965
NORTH FORK RD over FAWN CREEK
Built 1984
ROAD over LITTLE N SANTIAM R
Built 1991
09 S 03 E 11.03: over ELKHORN CREEK
Built 1971
07 S 03 E 14.02: over TABLE ROCK FORK MOLALLA
Built 1975
ROAD over GOLD CR
Built 1975
NORTH FORK RD over LITTLE NORTH SANTIAM R.
Built 2000
07 S 03 E 16.00: over SOUTH FORK MOLALLA RIVER
Built 1966
Bridge Details
- Structure #
- 0000000L1439381
- Year Built
- 1977
- Length
- 26.8 m (87.9 ft)
- Max Span
- 25.6 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Land Management
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.