06 S 04 E 06.00: over LUKENS CREEK

5.5 miles NE of Dickey Pr · County 005, Oregon · Built 1965 · 1 Lanes · 25 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439374
Year Built
1965
Length
21.9 m (71.9 ft)
Max Span
15.2 m
Width
5.8 m (19 ft)
Lanes
1
Daily Traffic
25
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$31,000
Total Project Cost
$52,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.