06 S 04 E 06.00: over NORTH FORK MOLALLA RIVER

5.7 miles NE of Dickey Pr · County 005, Oregon · Built 1968 · 1 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439373
Year Built
1968
Length
35.1 m (115.2 ft)
Max Span
22.9 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
100
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.