25 S 01 E 31.00: over CANTON CREEK
0.5 miles NE of Hwy 138 ( · County 019, Oregon · Built 1958 · 1 Lanes · 50 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.379439, -122.759719
This bridge is in worse condition than 75.4% of bridges in County 019. The average bridge in Oregon is 0 years old; this one is 68 years old.
Nearby Bridges
25 S 01 E 31.00: over CANTON CREEK
Built 1966
STEAMBOAT CR RD over CANTON CREEK
Built 1953
OR 138 (HWY 138) over STEAMBOAT CREEK
Built 1949
25 S 01 E 31.00: over CANTON CREEK
Built 1959
ROAD over NORTH UMPQUA RIVER
Built 1936
OR 138 (HWY 138) over WILLIAMS CREEK
Built 2010
FR3809 over S FK STEELHEAD CREEK
Built 2019
ROAD over NORTH UMPQUA RIVER
Built 1977
ROAD over FAIRVIEW CREEK CROSSING
Built 1984
24 S 01 W 26.00: over CANTON CREEK
Built 1964
Bridge Details
- Structure #
- 0000000L1439279
- Year Built
- 1958
- Length
- 54.9 m (180.1 ft)
- Max Span
- 21.3 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Bureau of Land Management
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $17,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.