25 S 01 E 31.00: over CANTON CREEK
0.5 miles NE of Hwy 138 ( · County 019, Oregon · Built 1966 · 1 Lanes · 50 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.371669, -122.745281
This bridge is in worse condition than 39.4% of bridges in County 019. The average bridge in Oregon is 0 years old; this one is 60 years old.
Nearby Bridges
25 S 01 E 31.00: over CANTON CREEK
Built 1958
STEAMBOAT CR RD over CANTON CREEK
Built 1953
OR 138 (HWY 138) over STEAMBOAT CREEK
Built 1949
ROAD over NORTH UMPQUA RIVER
Built 1936
OR 138 (HWY 138) over WILLIAMS CREEK
Built 2010
25 S 01 E 31.00: over CANTON CREEK
Built 1959
FR3809 over S FK STEELHEAD CREEK
Built 2019
ROAD over STEAMBOAT CREEK
Built 1954
ROAD over NORTH UMPQUA RIVER
Built 1977
ROAD over STEELHEAD CREEK
Built 1954
Bridge Details
- Structure #
- 0000000L1439278
- Year Built
- 1966
- Length
- 74.4 m (244.1 ft)
- Max Span
- 29.3 m
- Width
- 5 m (16.4 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Bureau of Land Management
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.