20 S 07 W 32.02: over SMITH RIVER

24.0 miles NW of Hwy 99 ( · County 019, Oregon · Built 1976 · 1 Lanes · 25 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439258
Year Built
1976
Length
40.2 m (131.9 ft)
Max Span
14.6 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
25
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.