20 S 07 W 27.00: over SMITH RIVER

25.5 miles NW of Hwy 99 ( · County 019, Oregon · Built 1963 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439256
Year Built
1963
Length
37.2 m (122 ft)
Max Span
15.2 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.