41 S 14HE 22.00: over LOST RIVER

17.5 miles SE of Bonanza · County 035, Oregon · Built 1957 · 1 Lanes · 25 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
0000000L1439139
Year Built
1957
Length
18.6 m (61 ft)
Max Span
6 m
Width
5.6 m (18.4 ft)
Lanes
1
Daily Traffic
25
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$45,000
Total Project Cost
$95,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.