Kowolski Road over Clear Lake Dam spillway
40 mi SE of Klamath Falls · County 049, California · Built 1999 · 1 Lanes · 1 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.926528, -121.076083
This bridge is in worse condition than 11.5% of bridges in County 049. The average bridge in California is 0 years old; this one is 27 years old.
Bridge Details
- Structure #
- KLAM-001
- Year Built
- 1999
- Reconstructed
- 2001
- Length
- 30.8 m (101 ft)
- Max Span
- 30.3 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 1
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Reclamation
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.