Kowolski Road over Clear Lake Dam spillway

40 mi SE of Klamath Falls · County 049, California · Built 1999 · 1 Lanes · 1 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

41.926528, -121.076083

This bridge is in worse condition than 11.5% of bridges in County 049. The average bridge in California is 0 years old; this one is 27 years old.

Nearby Bridges

Bridge Details

Structure #
KLAM-001
Year Built
1999
Reconstructed
2001
Length
30.8 m (101 ft)
Max Span
30.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
1
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Bureau of Reclamation
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.