20 S 08 W 18.02: over SMITH RIVER

40.8 miles NE of Hwy 101 · County 019, Oregon · Built 1961 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439037
Year Built
1961
Length
42.7 m (140.1 ft)
Max Span
21.3 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
50
Material
Concrete Continuous
Design
Tee Beam
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.