20 S 08 W 17.00: over SOUTH SISTERS CREEK

41.5 miles NE of Hwy 101 · County 019, Oregon · Built 1955 · 1 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0000000L1439036
Year Built
1955
Length
22.9 m (75.1 ft)
Max Span
15.2 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
50
Material
Concrete Continuous
Design
Tee Beam
Owner
Bureau of Land Management
Last Inspected
N/A
Est. Improvement
$6,000
Total Project Cost
$10,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.