SPLWY BRDG OK 251A over FT GIBSON L GRAND R SPWY
15 MI. NE. MUSKOGEE · County 145, Oklahoma · Built 1953 · 2 Lanes · 830 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
35.869828, -95.227997
This bridge is in worse condition than 95.3% of bridges in County 145. The average bridge in Oklahoma is 0 years old; this one is 73 years old.
Nearby Bridges
S.H. 80 over FLOWER CREEK
Built 1955
S.H. 80 over RANGER CREEK
Built 1994
N4004 over FLOWER CREEK TRIB.
Built 2003
N4410 over RATTLESNAKE CREEK TRIB.
Built 2015
E0830 over CREEK
Built 1939
E0830 over CREEK
Built 1939
E0770 over RANGER CREEK TRIB.
Built 2003
1136C/ N4410 over RANGER CREEK
Built 1995
E0780 over RATTLESNAKE CREEK
Built 2009
N4330 over CREEK
Built 2014
Bridge Details
- Structure #
- CEPSWTOKFTGIBSN
- Year Built
- 1953
- Reconstructed
- 2001
- Length
- 454.1 m (1489.8 ft)
- Max Span
- 12.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 830
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $64,938,000
- Total Project Cost
- $81,191,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.