E0830 over CREEK

1N 2.1E OF FT. GIBSON · County 101, Oklahoma · Built 1939 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

35.81305, -95.205444

This bridge is in worse condition than 70.5% of bridges in County 101. The average bridge in Oklahoma is 0 years old; this one is 87 years old.

Nearby Bridges

Bridge Details

Structure #
068840000000000
Year Built
1939
Length
7.9 m (25.9 ft)
Max Span
3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$143,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.