E0810 221ST ST over CREEK

2 SW OF PORTER OK · County 145, Oklahoma · Built 2022 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 5 Fair

Location

35.841928, -95.527206

This bridge is in worse condition than 84.8% of bridges in County 145. The average bridge in Oklahoma is 0 years old; this one is 4 years old.

Nearby Bridges

Bridge Details

Structure #
330730000000000
Year Built
2022
Length
18.3 m (60 ft)
Max Span
18.1 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.