E0800 over CREEK

0.5S OF PORTER · County 145, Oklahoma · Built 1938 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

35.856508, -95.528233

This bridge is in worse condition than 84.8% of bridges in County 145. The average bridge in Oklahoma is 0 years old; this one is 88 years old.

Nearby Bridges

Bridge Details

Structure #
059780000000000
Year Built
1938
Length
7.2 m (23.6 ft)
Max Span
3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$143,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.