I-40 EB OFF RAMP K over CONCRETE SLOPEWALL

I-40 OFF RAMP TO SHIELDS · County 109, Oklahoma · Built 2011 · 3 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
289670000000000
Year Built
2011
Length
64.8 m (212.6 ft)
Max Span
25.6 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$777,000
Total Project Cost
$2,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.