S ROBINSON AVE over N CANADIAN RVR & STREET
0.8 N OF SW 29TH/ROBINSON · County 109, Oklahoma · Built 1997 · 4 Lanes · 9,700 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.449331, -97.516283
This bridge is in worse condition than 81% of bridges in County 109. The average bridge in Oklahoma is 0 years old; this one is 29 years old.
Nearby Bridges
SE 15TH ST. over N. CANADIAN RIVER
Built 1999
N3075 S WALKER AVE over N. CANADIAN RIVER/ ST
Built 1983
N3080 (SANTA FE) over LIGHTNING CREEK
Built 1973
SHIELDS BLVD. over ST. RIVER/BNSF R.R. UND
Built 1980
ROBINSON AVE over I-40/ SLWC R.R. UNDER
Built 2011
I-40 EB OFF RAMP K over CONCRETE SLOPEWALL
Built 2011
SE 17TH ST over LIGHTNING CREEK
Built 2008
I-40 WB OFFRAMPN over CONCRETE SLOPEWALL
Built 2011
I-40 WB ON RAMP over CONC SLOPEWALL
Built 2011
I-40 WB RAMP LL over U.P. R.R. UNDER
Built 2011
Bridge Details
- Structure #
- 260580000000000
- Year Built
- 1997
- Length
- 244.4 m (801.8 ft)
- Max Span
- 30.5 m
- Width
- 21.7 m (71.2 ft)
- Lanes
- 4
- Daily Traffic
- 9,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,496,000
- Total Project Cost
- $3,048,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.