E2070 over MINERAL BAYOU CREEK
2S 1E OF SILO · County 013, Oklahoma · Built 2003 · 2 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
34.012097, -96.454853
This bridge is in worse condition than 33.2% of bridges in County 013. The average bridge in Oklahoma is 0 years old; this one is 23 years old.
Nearby Bridges
0730C over CHUCKWA CREEK
Built 1970
N3670 over ROCK CREEK
Built 1970
U.S. 70 BYPASS SB over MINERAL BAYOU CREEK
Built 2010
U.S. 70 BYPASS NB over MINERAL BAYOU CREEK
Built 2010
N3708 LARKSPUR LN over CREEK
Built 2008
SUNNYSIDE DR over U.S. 70 BYPASS UNDER
Built 2010
N3670 over ROCK CREEK
Built 2002
FAS0726 over NEWBERRY CREEK
Built 2012
FAU 3645 over MINERAL BAYOU CREEK
Built 1991
CALE SWITCH RD over U.S. 70 BYPASS UNDER
Built 2010
Bridge Details
- Structure #
- 270480000000000
- Year Built
- 2003
- Length
- 31.2 m (102.4 ft)
- Max Span
- 30.5 m
- Width
- 8.7 m (28.5 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $575,000
- Total Project Cost
- $913,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.