U.S. 70 BYPASS NB over MINERAL BAYOU CREEK

0.5 S JCT US-70 · County 013, Oklahoma · Built 2010 · 2 Lanes · 8,150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
293310000000000
Year Built
2010
Length
91.4 m (299.9 ft)
Max Span
30.5 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
8,150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$777,000
Total Project Cost
$2,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.