VINE ST. over DRAINAGE CANAL
150 S. OF COAL ST. · County 121, Oklahoma · Built 1998 · 2 Lanes · 200 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
34.961336, -95.756803
This bridge is in worse condition than 41.1% of bridges in County 121. The average bridge in Oklahoma is 0 years old; this one is 28 years old.
Nearby Bridges
7TH ST. over DRAINAGE CANAL
Built 1998
PLUM ST. over DRAINAGE CANAL
Built 1998
E1420 over CREEK
Built 1920
E1428 (PIERCE AVE) over DRAINAGE CANAL
Built 1975
FAU 4504 ELEC. AVE over DRAINAGE CANAL
Built 1950
FAU 4504 over DRAINAGE CANAL
Built 1973
6122C over MUDDY CK.- LK. EUFAULA
Built 1994
E1420 over CREEK
Built 1940
FAU 4452 (POLK AVE over DRAINAGE CANAL
Built 1975
U.S. 270 over CREEK
Built 1929
Bridge Details
- Structure #
- 261230000000000
- Year Built
- 1998
- Length
- 9.8 m (32.2 ft)
- Max Span
- 3 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.