FAU 4504 ELEC. AVE over DRAINAGE CANAL
.35 MI E US-69B · County 121, Oklahoma · Built 1950 · 2 Lanes · 4,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
34.947497, -95.757844
This bridge is in worse condition than 83% of bridges in County 121. The average bridge in Oklahoma is 0 years old; this one is 76 years old.
Nearby Bridges
FAU 4504 over DRAINAGE CANAL
Built 1973
FAU 4452 (POLK AVE over DRAINAGE CANAL
Built 1975
U.S. 270 over CREEK
Built 1929
E1428 (PIERCE AVE) over DRAINAGE CANAL
Built 1975
E1420 over CREEK
Built 1920
VINE ST. over DRAINAGE CANAL
Built 1998
7TH ST. over DRAINAGE CANAL
Built 1998
PLUM ST. over DRAINAGE CANAL
Built 1998
FAU 4488 (WASHINGT over U.P. R.R. UNDER
Built 1939
U.S. 270 EB over A OK R.R. & 9 ST.UNDER
Built 1965
Bridge Details
- Structure #
- 122920000000000
- Year Built
- 1950
- Length
- 18.6 m (61 ft)
- Max Span
- 18.3 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 4,500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $245,000
- Total Project Cost
- $390,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.