N3430 over CREEK

1.8 S & 2.5 E OF TECUMSEH · County 125, Oklahoma · Built 1997 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 5 Fair

Location

35.234344, -96.895161

This bridge is in worse condition than 69.1% of bridges in County 125. The average bridge in Oklahoma is 0 years old; this one is 29 years old.

Nearby Bridges

Bridge Details

Structure #
250850000000000
Year Built
1997
Length
13.1 m (43 ft)
Max Span
12.5 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$203,000
Total Project Cost
$323,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.