U.S. 270 SB over S.H. 9 UNDER
8.0 MI S OF SH3 · County 125, Oklahoma · Built 1989 · 2 Lanes · 5,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.261356, -96.919422
This bridge is in worse condition than 48.8% of bridges in County 125. The average bridge in Oklahoma is 0 years old; this one is 37 years old.
Nearby Bridges
U.S. 270 SB N-E over S.H. 9 WB UNDER
Built 1962
U.S. 270 NB over S.H. 9 UNDER
Built 1964
S.H. 9 over CREEK
Built 1946
U.S. 270 over CREEK
Built 1962
U.S. 270 RAMP over CREEK
Built 1961
U.S. 270 over CREEK
Built 1961
U.S. 270 RAMP over U.S. 270 / U.S. 177 UND
Built 1962
U.S. 270 over OLD S.H. 18(G.COOPER UND
Built 1997
E1200 over CREEK
Built 1982
U.S. 270 over OLD S.H. 18(G.COOPER UND
Built 1997
Bridge Details
- Structure #
- 223810000000000
- Year Built
- 1989
- Length
- 61 m (200.1 ft)
- Max Span
- 30.5 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 5,000
- Material
- Steel Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $579,000
- Total Project Cost
- $1,620,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.