U.S. 270 RAMP over U.S. 270 / U.S. 177 UND

US 270RAMP; @ US 270/177 · County 125, Oklahoma · Built 1962 · 1 Lanes · 6,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
155420000000000
Year Built
1962
Reconstructed
2022
Length
51.2 m (168 ft)
Max Span
19.8 m
Width
9.4 m (30.8 ft)
Lanes
1
Daily Traffic
6,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$622,000
Total Project Cost
$1,742,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.